Ready-to-Fill Aviation Fuel Farm Tanks

05 / FUEL FARM EXPANSION

Add storage capacity to the fuel farm you already operate.

Ready-to-Fill aviation tanks support projects that need additional storage within a larger fuel-farm system. Start with the existing equipment and define the tank, connection and monitoring scope around it. A clear interface plan makes the expansion quote useful.

A good fit when

An airport or FBO needs more aviation fuel storage connected to existing or separately specified transfer and dispensing equipment.

Ready-to-Fill / Fuel Farm system configuration
Representative configuration. Select the image to inspect it at full size.

WHAT MATTERS IN DAILY USE

Add the capacity your operation can actually use.

A fuel-farm expansion should work with the pumps, filtration, controls and dispensing equipment you intend to retain. Establish what the addition must achieve and where it connects before deciding that another tank is the complete solution.

Separate storage demand from transfer demand

More stored fuel can support a different delivery schedule or reserve target. It does not by itself make aircraft dispensing or truck loading faster. Check the existing transfer equipment and expected demand alongside the new capacity.

Airport-manager priority: solve the actual operating constraint.

Define each connection and signal

Specify fill, withdrawal and return connections together with level measurement, overfill functions and interstitial monitoring. The supplied Jet-A drawing documents a floating-suction assembly and position indicator; include them only when they belong in the new tank's approved scope.

Engineer priority: clear interfaces between new and retained equipment.

Plan inspection access and the cutover

The 12,000-gallon Jet-A reference includes two 24-inch manways and internal and external access provisions. Use that level of detail to discuss the new tank's service access. Agree on tie-in work, shutdown duration and temporary fueling before installation.

Contractor and operator priority: a buildable addition with a workable transition.

Locate new storage around the whole fuel farm.

A tank may connect to remote dispensing or truck loading without aircraft approaching it. Placement still needs delivery access, service clearances, suitable piping routes and room for any planned expansion.

The same system serves different responsibilities.

For the airport or FBO

Define the intended inventory benefit, future expansion and acceptable disruption to fueling.

For the engineer and contractor

Identify equipment supplied, reused and connected in the field. Record dimensions, foundation loads, nozzle positions, control interfaces and testing responsibilities.

For operators and maintenance

Review isolation, sampling, monitoring and access with the new tank in place. Confirm how it changes existing operating procedures.

Still defining the addition? Start with what should improve and the equipment being kept. Have drawings or a specification? Review the new tank's interface and supply boundary against those documents.

Fuel destination
New storage ↔ existing fuel farm
Connection
Project-specific fill, outlet, return and monitoring interfaces
Access
Works within your fuel farm’s operating controls

FEATURES FROM THE SYSTEM DRAWINGS

Storage features worth specifying in the expansion

The tank-side components in the supplied 12,000-gallon Jet-A drawing provide a useful reference for an expansion scope. Select the fittings and monitoring needed for your new tank; the complete dispensing package is not implied.

Service access designed into the tank

Two 24-inch manways, an internal ladder and an external step ladder with safety shield provide defined access provisions for authorized inspection and service.

A suction assembly that can be monitored

The floating-suction assembly and its position indicator are specified together. Include both the withdrawal arrangement and how it will be checked when connecting new storage.

Level measurement separate from leak monitoring

The electronic level console and sensor track stored fuel; the interstitial gauge addresses the secondary-containment space. Identify how each connects to existing fuel-farm controls.

Fill protection and fuel sampling connections

The overfill-prevention valve with diffuser and moisture hand pump establish separate provisions for receiving fuel and drawing a sample.

Configuration details that matter

These features are drawn from a complete Jet-A system as tank-side scope references. Confirm each item on the Ready-to-Fill quotation; do not assume its pump, meter, filter, reel or controls are included.

Drawing references for these features
  • Service access designed into the tank
    September 7, 2023 drawing · sheet 2 · BOM items 9, 10, 22, 34
  • A suction assembly that can be monitored
    September 7, 2023 drawing · sheet 2 · BOM items 19, 53
  • Level measurement separate from leak monitoring
    September 7, 2023 drawing · sheet 2 · BOM items 35, 36, 54
  • Fill protection and fuel sampling connections
    September 7, 2023 drawing · sheet 2 · BOM items 18, 48
  • 12,000 FG AVIATION SYSTEM WITH HOSE REEL AND NO RELAXATION CHAMBER.pdf
    September 7, 2023 · sheet 2

EQUIPMENT & OPTIONS

Define the boundary between the new tank and the existing fuel farm

A storage expansion quote needs an explicit equipment and work schedule. Identify what Envirosafe supplies, what will be reused and what the site contractor must connect.

Tank and fuel compatibility
Specify fuel grade, number of tanks, capacity, tank listing and required internal lining. Include Jet-A, AvGas, or any other proposed aviation fuel in the compatibility review.
Filling and withdrawal
Show the delivery fill point, tank inlet, suction or outlet, return lines and connection sizes. Identify the existing pumps and the required transfer rate.
Monitoring and protection
Define level measurement, overfill alarm and shutdown, interstitial monitoring, vents and their integration with existing controls.
Fuel-quality equipment
Identify existing filtration, floating suction, recirculation and sampling provisions, and any additions needed with the extra storage.
Site tie-in
Agree on piping, electrical and control interfaces, foundations, lifting access, testing, commissioning and planned shutdown duration.

EQUIPMENT & OPTIONS

Review the tank and fitting arrangement

This existing aviation tank illustration is a reference for discussing fittings and access. Its numbered components describe the illustrated configuration; final dimensions, listing, lining and connections belong on the approved project drawing.

Read the numbered equipment callouts
  • #1 - up to 5/16" thick exterior steel protection
  • #2 - lightweight thermal and ballistic concrete barrier
  • #3 - primary steel tank up to 5/16" thick coated with Chemliner 4000 epoxy
  • #4 - epoxy coated welded steel service ladder
  • #5 - Floating suction is of non-reactive aluminum construction
  • #6 - Moisture hand pump
  • #7 - welded external service ladder
  • #8 - fuel monitoring port
  • #9 - position meter for floating suction
  • #10 - 4 position lifting lugs
  • #11 - 24" floating suction serice manway
  • #12 - manual service shutoff valve for floating suction
  • #13 - Chemliner 4000 epoxy chemical resistant lining
  • #14 - pressure vacuum stack vent
  • #15 - 8" primary emergency vent
  • #16 - 24" primary service man way
  • #17 - 8" secondary emergency vent
  • #18 - Morrison Brothers or Veeder-Root fuel level gauge
  • #19 - overfill prevention valve
  • #20 - active flow control solenoid valve
  • #21 - interstitial leak gauge
  • #22 - 3" stainless steel fill line
  • #23 - 3" stainless steel flange
  • #24 - 3" stainless steel flanged fuel line
Review the tank and fitting arrangement
Representative configuration. Select the image to inspect it at full size.

TANK & FUEL SELECTION

Aviation fuel tank options: UL 142 Flameshield and UL 2085 Fireguard

Specify the tank and the fuel together. The construction, the listing and each fuel grade’s equipment scope are decided as one package.

UL 142 double-wall / Flameshield

Discuss the double-wall construction and Flameshield option with the project team. Confirm the listing and installation requirements for the actual site.

UL 2085 Fireguard

Discuss a protected Fireguard tank when the project calls for this construction. The selected listing, clearances and site design must be reviewed together.

Each fuel has its own equipment scope

Identify Jet-A, AvGas and every additional grade separately. For Jet A-1, Jet B, SAF blends or military fuels such as JP-4, JP-5 or JP-8, request a review of the actual fuel specification, lining, seals, filtration and dispensing components.

BUILD YOUR PROJECT SCOPE

What should we know for your quote?

Start with what you know. Our team can help resolve the remaining design decisions.

  1. Provide a site plan and the existing fuel-farm piping or process diagram, if available.
  2. List the fuel grade, nominal capacity and number of new tanks; identify existing usable storage.
  3. What pumps, filters, dispensers and loading equipment will remain in service?
  4. Specify fill, suction, return, vent, overfill and level-monitoring connections and their locations.
  5. Who will design and install interconnecting piping, electrical work, controls and foundations?
  6. Can the current fuel farm shut down for the tie-in, and for how long? What temporary fueling is needed?
More than one system?

List each system separately, with its own fuel, capacity, dispensing destination and controls. A site can combine several of these applications.

Build, copy or print your installation scope

FROM FACTORY TO SITE

How an aviation fueling system is delivered

Factory integration. A defined installation scope. The three steps below apply to every application.

01 / Design the system

Define fuel grades, storage, connections, equipment and controls. The quote and approved drawings establish what is included and what remains site work.

02 / Manufacture and prepare

Envirosafe manufactures the tank and integrates the specified package. Plumbing, wiring and checks that can be completed without fuel are addressed at the factory.

03 / Install and commission

Coordinate permits, foundations, lifting, utilities, site connections and startup responsibilities. Commissioning and fuel-quality checks must be completed before operation.

Explore other aviation applications

Made in U.S.A. for over 30 years!

A Proud American Manufacturer for Over 30 YearsMADE IN U.S.A.

Contact Us

800-555-4754
info@envirosafetanks.com
1789 E CR 48, Bushnell, FL 33513

Headquarters, USA

1-800-555-4754