A storage expansion quote needs an explicit equipment and work schedule. Identify what Envirosafe supplies, what will be reused and what the site contractor must connect.
- Tank and fuel compatibility
- Specify fuel grade, number of tanks, capacity, tank listing and required internal lining. Include Jet-A, AvGas, or any other proposed aviation fuel in the compatibility review.
- Filling and withdrawal
- Show the delivery fill point, tank inlet, suction or outlet, return lines and connection sizes. Identify the existing pumps and the required transfer rate.
- Monitoring and protection
- Define level measurement, overfill alarm and shutdown, interstitial monitoring, vents and their integration with existing controls.
- Fuel-quality equipment
- Identify existing filtration, floating suction, recirculation and sampling provisions, and any additions needed with the extra storage.
- Site tie-in
- Agree on piping, electrical and control interfaces, foundations, lifting access, testing, commissioning and planned shutdown duration.