Specify the tank and the fuel together. The construction, the listing and each fuel grade’s equipment scope are decided as one package.
Storage and configurationShown: the 1,500 to 2,500-gallon configuration. Documented transfer configuration: a 20,000-gallon Fireguard system.
Use your delivery quantity, consumption and operating reserve to define the storage requirement. Other capacities and equipment arrangements are quoted for the project.
UL 142 double-wall / Flameshield
Discuss the double-wall construction and Flameshield option with the project team. Confirm the listing and installation requirements for the actual site.
UL 2085 Fireguard
Discuss a protected Fireguard tank when the project calls for this construction. The selected listing, clearances and site design must be reviewed together.
Each fuel has its own equipment scope
Identify Jet-A, AvGas and every additional grade separately. For Jet A-1, Jet B, SAF blends or military fuels such as JP-4, JP-5 or JP-8, request a review of the actual fuel specification, lining, seals, filtration and dispensing components.